Building Permits
Driveway Permit
Application for
Building Permits
Borough of Bradford Woods
P.O. Box 163 (4908 Wexford Run Road)
Bradford Woods, PA 15015
Application for: Official Use Only
( ) New Dwelling Permit Number: ______________________
( ) Alterations and/or additions Application Date: _____________________
( ) Other Describe: ________________________ Fee Paid:
____________________________
Occupancy Paid: _____________________
Plot Plan Received: ___________________
Plans and Specifications Received: _______
Square Footage: ___________________________________ Zoning Permit if
Applicable: ____________
Grading Permit if Applicable: ___________
Property Location: Lot Number _____________________ Street
________________________________________
Recorded Plan of Lots
___________________________________________________________
Zoning District
_________________________________________________________________
Property Owner: _____________________________________________________ Phone:
__________________
Address:
_____________________________________________________________________________________
Proposed Use of Structure:
_______________________________________________________________________
General Contractor: __________________________________________________
Phone: __________________
Address:
_____________________________________________________________________________________
Value of proposed construction is _______________________________________.
(Verification required by signed agreement with contractor). Permit fee is
$4.00 per $1,000.00 of construction value. Multiply above value by .004 and
remit with application. Occupancy fee due with permit.
I hereby certify that the above information is true and correct and that all
work will be done in accordance with applicable ordinances and codes
established and/or adopted by Bradford Woods Borough, Allegheny County,
Commonwealth of Pennsylvania.
Owner’s Signature _____________________________________________ Date:
____________________
Items needed with application:
1. Site Plans Sealed (2 Copies)
2. Sealed Plans of Structure (3 Copies)
3. Stormwater Management Plan (2 copies)
4. Signed contractural agreement (fee based upon this agreement)
5. Proof of Insurance
6. See attached “Residential Building Permit Submission Requirements”
NOTE: Inspection Fees are $40 an hour payable prior to issuing of Occupancy
Permit.
Larry Kurpakus – Building Inspector for Bradford Woods 724-625-1636 X 133
Allegheny County Plumbing Inspections – 412-578-8036
Third Party Approved Electrical Inspectors – list available at office
Please be aware of the following:
1. If opening of a road or berm is required for installation of utilities a
permit must be obtained.
2. If a “paper” road is to be developed a permit must be obtained.
3. Driveway installation requires a separate permit.
4. Stormwater runoff must comply with Borough Codes.
5. All residential construction will comply with ICC 2006 International
Residential Code.
6. All commercial will comply with the ICC 2006 Building Code, Mechanical
Code, Energy
Conservation Code, Electrical Code, Fuel Gas Code, Fire Code, Existing
Building Code and
Urban-Wildland Interface Code.
7. Completion of construction requires a final Occupancy Permit.
8. Grading must comply with Ordinance 249 and Zoning Ordinance 225.
Occupancy Permit
Requirements Check List
General
_____ 1. The house must be at least 80% complete in accordance with the
approved drawings.
_____ 2. Zoning Occupancy Application completed. Fee paid.
Structure
_____ 1. Structurally completed. No temporary supports.
_____ 2. Built in accordance with applicable building codes and approved
drawings.
Fire Protection
_____ 1. All required fire rated partitions in place.
_____ 2. Smoke detectors in place.
Site Work
_____ 1. No open trenches, ditches or excavations.
_____ 2. No unstable grading or piles of materials.
_____ 3. No trash and debris littering site.
_____ 4. No dumpsters on site.
_____ 5. All utility hook-ups permanent.
_____ 6. Driveway complete to extent of preventing on-street parking and
tracking mud onto roadways.
_____ 7. No portable toilet facilities on site.
_____ 8. If landscaping and yard incomplete, site to have control features
in place to prevent silt and runoff from
flowing onto streets or adjoining properties.
_____ 9. Damage to any Borough roadways or infrastructure repaired.
_____10. No roof or surface drain pipe permitted to runoff onto Borough Road
or neighboring residence
Residential Stormwater Management
_____ 1. Provide area of imperious surface (pavement & roofs) on proposed
development site plan.
_____ 2. If area is under 400 s.f. in surface area no additional work is
required and “best management practice” methods shall be used.
_____3. If area is between 400 s.f. and 3000 s.f. use the Standard Rock Sump
Design Procedure to size stormwater detention system. Alternatively,
commercially available systems shall be considered as well as surface ponds
_____4 Submit detention system plans, material specifications, and product
literature for review.
Façade
_____ 1. All façade features (siding, windows, door and roof) to be 90%
complete.
_____ 2. Façade constructed in accordance with approved drawings.
Mechanical Systems
_____ 1. HVAC system installed and operating in accordance with installation
specifications.
_____ 2. Proper permanent burner exhaust system installed.
_____ 3. HVAC system fail-safe devices installed (flame detectors,
water/steam over pressure valves,
water/steam over-temperature valves).
Plumbing and Piping
_____ 1. Roof drain, storm water runoff or surface water prohibited into
MTSA sewage lines
_____ 2. All water, natural gas, oil and waste pipe lines permanently
installed in accordance with applicable codes
and industry accepted standards.
_____ 3. Bath and toilet facilities in operating condition.
_____ 4. All County Health Department inspection and approvals done.
Electrical
_____ 1. Wiring and electrical devices permanently installed in accordance
with applicable codes and
industry accepted standards with approve and certified Third Party
Electrical Inspectors
_____ 2. All County Health Department inspections and approvals done.
_____ Occupancy Permit Issued
AFFIDAVIT OF EXEMPTION
BOROUGH OF BRADFORD WOODS
The undersigned affirms that he/she is not required to provide workers
compensation insurance under the provisions of Pennsylvania’s Workers
Compensation Law for one of the following reasons:
____ Property owner performing own work. If property owner does hire
contractor to perform any work pursuant to building permit, contractor must
provide proof of workers compensation insurance to the Borough. Homeowner
assumes liability for contractor compliance with this requirement.
_____ Contractor has no employees. Contractor prohibited by law from
employing any individual to perform work pursuant to his building permit
unless contractor provides proof of insurance to the Borough.
_____ Religious exemption under the Workers Compensation Law. All employees
of contractor are exempt from workers compensation insurance (attach copies
of religious exemption letters for all employees).
____________________________
Signature of Applicant
County of Allegheny
Borough of Bradford Woods
Subscribed, sworn to and acknowledged before me by the above
_________________________
this _________ day of _________________ 20____
____________________________
Notary Public
Zoning Ordinance 375 – Table
201
|
|
R-1 Single
Family |
R-2
Residential |
B-1 Rural
Business |
|
Permitted Uses |
One Family
Dwelling
Parks, Public
Schools
K-12) Churches
Accessory Uses |
One Family
Dwelling
Parks, Public
Schools
(K-12) Churches
Accessory Uses |
Antique Shop
Child
Care Center
Churches, Farm
Market,
Parks,
Recreation,
Rural Office,
Rural Store,
Single Family
Dwelling
Public Schools
(K-12) |
|
Conditional
Uses |
Public
Buildings
Private Swim
Clubs
Small Community
Residential
Facility |
Public
Buildings, Public Swim Clubs,
PRD, Small Com.
Residential
Facility |
Public
Buildings, Restaurant, Accessory Uses-Bed & Breakfast
Small Community
Residential
Facility |
|
Special
Exceptions |
Permitted Use
Structure
Exceeding 35
ft. |
Permitted Use
Structure Exceeding 35 ft. |
Permitted Use
Structure Exceeding 35 ft. |
|
Minimum Lot Area |
43,560 square
feet |
43,560 square
feet |
43,560 square
feet |
|
Minimum Lot Area Per Family |
43,560 square
feet |
43,560 square
feet |
43,560 square
feet |
|
Mean Width |
150 feet |
150 feet |
150 feet |
|
Minimum Length
of Front Lot Line Along Edge of Public/Private Right-of-Way |
100 feet |
100 feet
PRD 300 feet
|
100 feet |
|
Minimum Front
Yard |
50 feet |
50 feet
PRD 75 feet |
50 feet |
|
Minimum Rear
Yard |
50 feet* |
50 feet
PRD 75 feet |
50 feet* |
|
Minimum Side
Yard |
20 feet* |
20 feet*
PRD 75 feet |
30 feet* |
|
Minimum Sum of
Side Yards |
50 feet |
50 feet |
75 feet |
|
Maximum Height |
35 feet |
35 feet |
35 feet |
|
Maximum
Building Coverage |
|
|
10% |
|
Maximum Removal
of Natural Veg. |
35% |
35% |
60% |
|
Maximum Removal
of Natural
Vegetation from
Slopes |
8-15% - 35%
15-25% - 30%
Over 25% - 20% |
8-15% - 35%
15-25% - 30%
Over 25% -
20% |
8-15% - 35%
15-25% - 30%
Over 25% -
20% |
|
Non Disturbance
Zone of Natural Drainage Course |
50 feet |
50 feet |
50 feet
|
Zoning
Ordinance 375 – Table 202
|
*Minimum
side or rear yard abutting any lot in any “R” district by
non-residential structures or uses |
Use |
|
25 feet |
Off-street
parking spaces and access drives for non-residential uses |
|
50 feet |
Churches,
schools, public buildings and permitted rural business structures |
|
80 feet |
Recreational
facilities |
Bradford Woods
Borough Summary: Typical development in the Borough can be characterized as
Low Impact when it comes to analyzing the effect of excess stormwater on the
natural drainage features present. As such, the typical approach to
stormwater management would be to allow the natural features of the
landscape to accommodate the excess stormwater created from the introduction
of impervious surfaces to sites. These impervious surfaces would typically
be roof areas, patios and other paved areas on an individual site. It is
when the excess stormwater is routed to streets and not the natural drainage
features that the collective impact can affect downstream property owners.
The addition of the rock sump detention facility for on site control of
excess stormwater as a design tool could assist in mitigating the collective
effect of excess stormwater on the drainage feature. Evidence of this
problem has been observed in limited instances within the Borough. Two come
to mind, the first is along the western side of Wexford Run Road, a second
is at the northeast corner of Bradford Road and Centervue Road, a third is
the property west of the Reserve on Bradford Road, and finally the property
at the northeast corner of Bradford Road and Willow Road. Z:\Bradfordwoods
Borough\Sump design\032408_Sump design manual.doc 190-X Design of Rock Sump
Stormwater Detention System for Small Project Areas DEFINITIONS ROCK SUMP
DETENTION SYSTEM: The system is an in-ground assembly of stone set inside an
impervious membrane with piping to allow stormwater collection and
subsequent release at a controlled rate of release. The system shall include
a distribution structure and an outlet structure. IMPERVIOUS: A surface
where the coefficient of water absorption is 0.95 or greater. This
correlates to a surface from which 95% of the stormwater striking the
surface is NOT absorbed. DESIGN CRITERIA The use of a rock sump is one of
several alternatives that may be appropriate for small project area
developments. A small project shall be defined as an impervious surface area
of under 3000 square feet. This can be further divided for purposes of the
sump design as impervious surfaces of less than 400 square feet and 400
square feet to 3000 square feet. For our purposes it is assumed that the
limit of 3000 square feet reflects the maximum impervious surface area for a
project expected to be encountered within the Borough. Site conditions must
also be considered when determining the suitability of a sump for stormwater
control. Parameters that will influence the decision on selecting a rock
sump for stormwater control include: • Soil type: Is soil type or condition
suitable for sump. Will rock be encountered? • Slope: Does site allow for
natural release of stormwater into suitable natural drainage features •
Discharge location: Is there a suitable location to discharge the stormwater
without negatively impacting neighboring properties • Basement Elevation:
Elevation of occupied spaces and the introduction of the sump could be
problematic. • Offsite stormwater conveyance systems: Where is the retained
stormwater going to be released to? This will most likely be a natural
drainage feature within the Borough. Where it is determined that a rock sump
is appropriate, the following procedure is designed to provide a fast,
simple method to determine the rock volume and orifice size required to
provide adequate stormwater control for small projects. In order to develop
a practical solution for this type of design, several qualifying assumptions
are necessary to set the limits for which the procedure is applicable. Those
limits were designed to incorporate the type of situation most often
encountered. In general, the following conditions must be satisfied in order
for the use of rock sumps to be appropriate. • The project area, meaning the
impervious area of roof or other hard surface areas, contributing to the
volume introduced to the sump is more than 400 square feet in area and less
than 3000 square feet. This shall be measured from a horizontal plane above
the surface considered. • To minimize the sump size, excess stormwater from
impervious surfaces should be collected and conveyed to the sump in separate
drainage systems. If excess stormwater from impervious surfaces is not
isolated, the sump must be designed for the entire area that will be
contributing to the detention system. This type of approach Z:\Bradfordwoods
Borough\Sump design\032408_Sump design manual.doc would direct excess
stormwater to the open grate of the distribution structure as shown on the
drawings. • The rock sump must be designed according to the attached
drawings. • If the impervious area is less than 400 square feet, the
alternate infiltration sump design as shown on the drawings should be used.
SUMP DESIGN SIZING PROCEDURE Use the following procedure to design the rock
sump. 1. Determine the area of the impervious surfaces that will be
collected and conveyed to the sump. This can be accomplished by calculating
the surface areas from a plan view of the structure and any hard surfaced
landscape areas that do not have a natural drainage feature to release
excess stormwater to. 2. Enter the sizing table and determine the volume of
the sump required. 3. Continue across the table to determine the size of the
release orifice. 4. Determine the sump dimensions based upon site topography
and surface features. 5. Design the sump in accordance with the parameters
shown on the drawings giving special attention to the size of the
distribution and release structures, the stone specification, the membrane
type and the piping. MATERIAL SPECIFICATION SUGGESTIONS Stone: AASHTO No. 57
limestone or 2B washed gravel Membrane: Similar to PENNDOT type 2B Nonwoven
Geotextile Fabric Distribution/Outlet Structures: Precast concrete HDPE 24”
x 24” inlet box up to 5’ in depth, 24” x 48” over 5’ in depth. Outlet Lid:
24” x 24” Neenah R-1883-G6 or G4; 24” x 48” Neenah R-1879-L Inflow and
Outflow drain pipe: 4” diameter PVC Schedule 40 Distribution pipe: 6”
diameter AASHTO M252 type C HDPE single wall perforated drain pipe. Z:\Bradfordwoods
Borough\Sump design\032408_Sump design manual.doc ROCK SUMP DETENTION SYSTEM
FOR SMALL PROJECT AREAS IMPERVIOUS AREAS 400 – 3000 SQ FT DEPTH OF SUMP (ft)
1 2 3 4 5 SUMP VOLUME REQUIRED (cu ft) IMPERVIOUS DIAMETER OF OUTLET ORIFICE
NET ROCK AREA (sq ft (in) 400 11/16 9/16 1/2 1/2 1/2 68 170 600 13/16 11/16
5/8 9/16 9/16 102 255 800 15/16 13/16 11/16 5/8 5/8 136 340 1000 1-1/16 7/8
13/16 3/4 11/16 170 425 1200 1-3/16 1-0 7/8 13/16 3/4 204 510 1400 1-1/4
1-1/16 15/16 7/8 13/16 238 595 1600 1-3/8 1-1/8 1-0 15/16 7/8 272 680 1800
1-7/16 1-3/16 1-1/16 1-0 15-16 306 765 2000 1-1/2 1-1/4 1-1/8 1-1/16 1-0 340
850 2200 1-9/16 1-5/16 1-3/16 1-1/8 1-1/16 374 935 2400 1-5/8 1-3/8 1-1/4
1-3/16 1-1/8 408 1020 2600 111/16 1-7/16 1-5/16 1-1/4 1-1/8 442 1105 2800
1-3/4 1-1/2 1-3/8 1-1/4 1-3/16 476 1190 3000 113/16 1-9/16 1-3/8 1-5/16
1-1/4 510 1275 Bradford Woods Borough Rock Sump Sizing Table Page 1 of 5
November 30, 2005 Z:\Bradfordwoods Borough\Sump design\032408_Sump design
manual.doc ROCK SUMP OUTLET STRUCTURE Bradford Woods Borough Rock Sump
Stormwater Detention System for Small Project Areas Page 2 of 5 November 30,
2005 Z:\Bradfordwoods Borough\Sump design\032408_Sump design manual.doc ROCK
SUMP OUTLET STRUCTURE PLAN VIEW OF ROCK SUMP Bradford Woods Borough Rock
Sump Stormwater Detention System for Small Project Areas Page 3 of 5
November 30, 2005 Z:\Bradfordwoods Borough\Sump design\032408_Sump design
manual.doc 4” DIA PVC OUTFLOW DRAIN. MIN SLOPE @1% Bradford Woods Borough
Rock Sump Stormwater Detention System for Small Project Areas Page 4 of 5
November 30, 2005 Z:\Bradfordwoods Borough\Sump design\032408_Sump design
manual.doc WRAP ENTIRE SUMP WITH MEMBRANE FABRIC Bradford Woods Borough
Infiltration Sump System for Small Project Areas Sheet 5 of 5 November 30,
2005 Z:\Bradfordwoods Borough\Sump design\032408_Sump design manual.doc Z:\Bradfordwoods
Borough\Sump design\032408_Sump design manual.doc
Application for
Driveway Permit
Borough of Bradford Woods
(Ordinance No. 379) – (Codification Chapter 110)
Application Number: __________________________ Date:
___________________________
Fee: $20.00
NOTICE: Any permit issued pursuant to the approval of this application may
be revoked if the issuance of the permit was based upon any incomplete or
inaccurate information or it violates any Bradford Woods Ordinance,
Pennsylvania Statutes, United States Laws, or Court Precedents.
FEE: As set by resolution and is to accompany this application.
INSTRUCTIONS: Applicant is to accurately complete all information requested.
Questions about the application should be addressed to the Zoning Officer or
Borough Secretary (724-935-2990).
1. Location of Property
Mail Address:
__________________________________________________________________________
Describe Property:
______________________________________________________________________
2. Information About Owner
Name:
________________________________________________________________________________
Address: ________________________________________________________Phone:
________________
3. Information About Applicant
Applicant is: ( ) Owner ( ) Agent ( ) Lessee ( ) Other, Specify
________________________
Name:
________________________________________________________________________________
Address: ________________________________________________________ Phone:
_______________
4. Information Required
a. PLAN – to include the following:
1. Location, length, width, depth & grade of culvert
2. Surface or resurfacing material
3. Exact location of proposed installation of grating, drains or pipes
4. Grating, drains or pipe diameter & material
5. Storm water management control plan
b. HIGHWAY OCCUPANCY PERMIT – (If proposed driveway abuts on Wexford Run
Road)
NOTE: No installation can take place until a site inspection has been
conducted and the permit issued by an Authorized Representative of the
Borough. After issuance of the permit, installation shall be in strict
compliance with the specifications so noted on the permit.
Driveways shall be graded for proper drainage and surfaced with asphalt,
stone, brick, concrete or other approved material so as to provide for a
durable surface and have storm water runoff controlled. NO DIRT DRIVEWAYS
ARE PERMITTED.
The applicant certifies that the above information is complete and true and
correct to the best of the applicant’s knowledge and belief. The applicant
also agrees to comply with all the provisions of Bradford Woods Ordinances,
Codes and Regulations, and all other applicable laws and regulations of
Allegheny County, Commonwealth of Pennsylvania and the United States,
whether or not specified in this application.
THE APPLICANT AGREES THAT IF A PERMIT IS ISSUED, THE PERMIT MAY BE REVOKED
BY ADMINISTRATIVE ACTION OF BRADFORD WOODS IF COMPLIANCE WITH THE FOREGOING
TWO PARAGRAPHS IS NOT ABSOLUTE.
Date: _____________________ 20______________________________________________
Signature of Applicant
------------------------------------------------------------------------------------------------------------------------------------------
DRIVEWAY PERMIT
The Driveway Permit requested is ISSUED __________________ (date), DENIED
________________(date) for
the following reason(s):
________________________________________________________________________
Fee: ________________ By
___________________________________________________________
Zoning Officer, Borough of Bradford Woods
|